{"id":2164,"date":"2021-06-11T16:19:12","date_gmt":"2021-06-11T14:19:12","guid":{"rendered":"http:\/\/agil-on.com\/?p=2164"},"modified":"2021-06-11T16:19:12","modified_gmt":"2021-06-11T14:19:12","slug":"upgrade-to-sap-s4hana-2020","status":"publish","type":"post","link":"https:\/\/agil-on.com\/en\/upgrade-to-sap-s4hana-2020\/","title":{"rendered":"Upgrade to SAP S\/4HANA 2020"},"content":{"rendered":"<div style=\"padding-top:0px;\t\r\npadding-right:0px;\r\npadding-bottom:0px;\r\npadding-left:0px;\r\nmargin-top:0px;\r\nmargin-right:0px;\r\nmargin-bottom:0px;\r\nmargin-left:0px;\"><a href=\"https:\/\/twitter.com\/AgilonGmbh\" class=\"twitter-follow-button\" \r\n\t\t\t\t\t\tdata-show-count=\"false\"\r\n\t\t\t\t\t\tdata-lang=\"autoLANGauto\"\r\n\t\t\t\t\t\tdata-width=\"250px\"\r\n\t\t\t\t\t\tdata-align=\"left\"\r\n\t\t\t\t\t\tdata-show-screen-name=\"true\"\r\n\t\t\t\t\t\tdata-size=\"medium\"\r\n\t\t\t\t\t\tdata-dnt=\"false\">\r\n\t\t\t\t\t\tFollow @AgilonGmbh <\/a> <\/div>\r\n\t\t\t\t\t\t<script>\r\n\t\t\t\t\t\t!function(d,s,id) {\r\n\t\t\t\t\t\t  var js,fjs=d.getElementsByTagName(s)[0];\r\n\t\t\t\t\t\t  if(!d.getElementById(id)) {\r\n\t\t\t\t\t\t   js=d.createElement(s);\r\n\t\t\t\t\t\t   js.id=id;js.src=\"\/\/platform.twitter.com\/widgets.js\";\r\n\t\t\t\t\t\t   fjs.parentNode.insertBefore(js,fjs);\r\n\t\t\t\t\t\t  }\r\n\t\t\t\t\t\t}\r\n\t\t\t\t\t\t(document,\"script\",\"twitter-wjs\");\r\n\t\t\t\t\t\t<\/script><p class=\"p1\"><span class=\"s1\">We upgraded our On-Premise demo system from S\/4 HANA 1909 to 2020 and would like to share our experiences with you in this blog post. <\/span><span class=\"s1\">SUSE Linux Enterprise Server 15 SP2 is the operating system.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Before starting an update, make sure to study the instructions provided by SAP, e.g.<\/span><\/p>\n<ul>\n<li class=\"p1\"><span class=\"s1\">The Upgrade Guide to S\/4HANA 2020,<\/span><\/li>\n<\/ul>\n<p class=\"p3\"><span class=\"s2\"><a href=\"https:\/\/help.sap.com\/doc\/760ce610a2af4174a329d2d8315378e2\/2020\/en-US\/UPGR_OP2020.pdf\"><span class=\"s3\">https:\/\/help.sap.com\/doc\/760ce610a2af4174a329d2d8315378e2\/2020\/en-US\/UPGR_OP2020.pdf<\/span><\/a><\/span><\/p>\n<ul>\n<li class=\"p1\"><span class=\"s1\">The Software Update Manager (SUM) 2.0 guide (latest Version)<br \/>\nWe have chosen the following version for our operating system:<br \/>\n<i>Updating SAP ABAP Systems on UNIX and Linux: SAP HANA DB<\/i><\/span><\/li>\n<\/ul>\n<p class=\"p4\"><span class=\"s1\"><a href=\"https:\/\/help.sap.com\/viewer\/b0d775c8a9fd47b985a5e66ddba31d33\/sum20.10\/en-US\/66929d3006e446a9b348a724b5e0c1bd.html\"><span class=\"s3\">https:\/\/help.sap.com\/viewer\/b0d775c8a9fd47b985a5e66ddba31d33\/sum20.10\/en-US\/66929d3006e446a9b348a724b5e0c1bd.html<\/span><\/a><\/span><\/p>\n<h2 class=\"p5\"><b><span class=\"s1\">Maintenance Planer<\/span><\/b><\/h2>\n<p class=\"p1\"><span class=\"s1\">A first step in the upgrade process is to run the Maintenance Planer. The tool makes ensures the compatibility of your current system with the release you are upgrading to. Here you select the components and add-ons to download. Also, a stack file is created, which will be used during the upgrade process with the Software Update Manager (SUM).<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Go to Explore Systems:<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/02-SAP-MaintPlaner.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2320\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/02-SAP-MaintPlaner.jpg\" alt=\"\" width=\"1361\" height=\"685\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/02-SAP-MaintPlaner.jpg 1361w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/02-SAP-MaintPlaner-300x151.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/02-SAP-MaintPlaner-1024x515.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/02-SAP-MaintPlaner-768x387.jpg 768w\" sizes=\"(max-width: 1361px) 100vw, 1361px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Choose the System you want to upgrade. Make sure that you updated your system information first either with the SAP Solution Manager or with an upload of your system data to the SAP Support Portal (see also SAP Note <a href=\"https:\/\/launchpad.support.sap.com\/#\/notes\/2855951\"><span class=\"s2\">2855951<\/span><\/a>).<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/03-SAP-MaintPlaner.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2318\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/03-SAP-MaintPlaner.jpg\" alt=\"\" width=\"1366\" height=\"335\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/03-SAP-MaintPlaner.jpg 1366w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/03-SAP-MaintPlaner-300x74.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/03-SAP-MaintPlaner-1024x251.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/03-SAP-MaintPlaner-768x188.jpg 768w\" sizes=\"(max-width: 1366px) 100vw, 1366px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Plan a Software Change on your System:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/04-SAP-MaintPlaner.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2316\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/04-SAP-MaintPlaner.jpg\" alt=\"\" width=\"1356\" height=\"719\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/04-SAP-MaintPlaner.jpg 1356w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/04-SAP-MaintPlaner-300x159.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/04-SAP-MaintPlaner-1024x543.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/04-SAP-MaintPlaner-768x407.jpg 768w\" sizes=\"(max-width: 1356px) 100vw, 1356px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Plan an SAP S\/4 HANA Upgrade -&gt; Select Shipment Stack -&gt; Confirm Selection.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/05-SAP-MaintPlaner.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2314\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/05-SAP-MaintPlaner.jpg\" alt=\"\" width=\"1360\" height=\"668\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/05-SAP-MaintPlaner.jpg 1360w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/05-SAP-MaintPlaner-300x147.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/05-SAP-MaintPlaner-1024x503.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/05-SAP-MaintPlaner-768x377.jpg 768w\" sizes=\"(max-width: 1360px) 100vw, 1360px\" \/><\/a><\/p>\n<p class=\"p1\"><span class=\"s1\">Select Files.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/06-SAP-MaintPlaner.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2312\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/06-SAP-MaintPlaner.jpg\" alt=\"\" width=\"1360\" height=\"516\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/06-SAP-MaintPlaner.jpg 1360w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/06-SAP-MaintPlaner-300x114.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/06-SAP-MaintPlaner-1024x389.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/06-SAP-MaintPlaner-768x291.jpg 768w\" sizes=\"(max-width: 1360px) 100vw, 1360px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">It is recommended to deselect not needed language archives either here or later in the Download Manager, which can significantly reduce the download volume.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/07-SAP-MaintPlaner.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2310\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/07-SAP-MaintPlaner.jpg\" alt=\"\" width=\"1359\" height=\"708\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/07-SAP-MaintPlaner.jpg 1359w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/07-SAP-MaintPlaner-300x156.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/07-SAP-MaintPlaner-1024x533.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/07-SAP-MaintPlaner-768x400.jpg 768w\" sizes=\"(max-width: 1359px) 100vw, 1359px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Now you can Download the (1) Stack XML File, which will later be used in the Software Update Manager (SUM) and (2) Push the files to the Download Basket.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/08-SAP-MaintPlaner.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2308\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/08-SAP-MaintPlaner.jpg\" alt=\"\" width=\"1359\" height=\"682\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/08-SAP-MaintPlaner.jpg 1359w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/08-SAP-MaintPlaner-300x151.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/08-SAP-MaintPlaner-1024x514.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/08-SAP-MaintPlaner-768x385.jpg 768w\" sizes=\"(max-width: 1359px) 100vw, 1359px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">In our case 115 files were pushed to the Download Manager, a total of 51 GB of data. As mentioned before, it makes sense deselect unneeded language archives, as they can be between 300 and 800 MB in size.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/09-SAP-DownloadManager.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2306\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/09-SAP-DownloadManager.jpg\" alt=\"\" width=\"943\" height=\"356\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/09-SAP-DownloadManager.jpg 943w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/09-SAP-DownloadManager-300x113.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/09-SAP-DownloadManager-768x290.jpg 768w\" sizes=\"(max-width: 943px) 100vw, 943px\" \/><\/a><\/p>\n<h2><\/h2>\n<h2 class=\"p5\"><b><span class=\"s1\">HANA 2.0 DB Upgrade<\/span><\/b><\/h2>\n<p class=\"p1\"><span class=\"s1\">Your SAP HANA database version is checked by SAP SUM before upgrading. We took the opportunity to update our database before upgrading.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Make a backup of the database in SAP HANA Studio before the upgrade.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/10-SAP-HanaStudio.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2304\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/10-SAP-HanaStudio.jpg\" alt=\"\" width=\"1154\" height=\"423\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/10-SAP-HanaStudio.jpg 1154w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/10-SAP-HanaStudio-300x110.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/10-SAP-HanaStudio-1024x375.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/10-SAP-HanaStudio-768x282.jpg 768w\" sizes=\"(max-width: 1154px) 100vw, 1154px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Backup of the SYSTEMDB in SAP HANA Studio:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/11-SAP-HanaStudio.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2302\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/11-SAP-HanaStudio.jpg\" alt=\"\" width=\"579\" height=\"326\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/11-SAP-HanaStudio.jpg 579w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/11-SAP-HanaStudio-300x169.jpg 300w\" sizes=\"(max-width: 579px) 100vw, 579px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Backup of the Tenant Database in SAP HANA Studio:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/12-SAP-HanaStudio.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2300\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/12-SAP-HanaStudio.jpg\" alt=\"\" width=\"578\" height=\"327\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/12-SAP-HanaStudio.jpg 578w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/12-SAP-HanaStudio-300x170.jpg 300w\" sizes=\"(max-width: 578px) 100vw, 578px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">With the SAP HANA Lifecycle Manager, we upgraded our Database from HANA 2.00.045 to 2.00.053. After Downloading the SAP HANA Database archive, extract it with the Program SAPCAR. This is how it is done from the command line.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/13-SAPCAR.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2292\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/13-SAPCAR.jpg\" alt=\"\" width=\"1145\" height=\"716\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/13-SAPCAR.jpg 1145w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/13-SAPCAR-300x188.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/13-SAPCAR-1024x640.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/13-SAPCAR-768x480.jpg 768w\" sizes=\"(max-width: 1145px) 100vw, 1145px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Then on Linux the SAP HANA Lifecycle Manager can be started from the extracted directory: SAP_HANA_DATABASE. In our example we choose the GUI version \u2018hdblcmgui\u2019.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/14-STARTING_HDBLCM.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2290\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/14-STARTING_HDBLCM.jpg\" alt=\"\" width=\"1142\" height=\"722\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/14-STARTING_HDBLCM.jpg 1142w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/14-STARTING_HDBLCM-300x190.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/14-STARTING_HDBLCM-1024x647.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/14-STARTING_HDBLCM-768x486.jpg 768w\" sizes=\"(max-width: 1142px) 100vw, 1142px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">The GUI of the SAP HANA Lifecycle Manager guides you intuitively through the upgrade process.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/15-SAP-HanaLifecycle.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2298\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/15-SAP-HanaLifecycle.jpg\" alt=\"\" width=\"1092\" height=\"325\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/15-SAP-HanaLifecycle.jpg 1092w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/15-SAP-HanaLifecycle-300x89.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/15-SAP-HanaLifecycle-1024x305.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/15-SAP-HanaLifecycle-768x229.jpg 768w\" sizes=\"(max-width: 1092px) 100vw, 1092px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/16-SAP-HanaLifecycle.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2296\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/16-SAP-HanaLifecycle.jpg\" alt=\"\" width=\"1094\" height=\"401\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/16-SAP-HanaLifecycle.jpg 1094w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/16-SAP-HanaLifecycle-300x110.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/16-SAP-HanaLifecycle-1024x375.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/16-SAP-HanaLifecycle-768x282.jpg 768w\" sizes=\"(max-width: 1094px) 100vw, 1094px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/17-SAP-HanaLifecycle.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2294\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/17-SAP-HanaLifecycle.jpg\" alt=\"\" width=\"1092\" height=\"313\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/17-SAP-HanaLifecycle.jpg 1092w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/17-SAP-HanaLifecycle-300x86.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/17-SAP-HanaLifecycle-1024x294.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/17-SAP-HanaLifecycle-768x220.jpg 768w\" sizes=\"(max-width: 1092px) 100vw, 1092px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/18-SAP-HanaLifecycle.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2288\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/18-SAP-HanaLifecycle.jpg\" alt=\"\" width=\"1098\" height=\"367\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/18-SAP-HanaLifecycle.jpg 1098w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/18-SAP-HanaLifecycle-300x100.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/18-SAP-HanaLifecycle-1024x342.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/18-SAP-HanaLifecycle-768x257.jpg 768w\" sizes=\"(max-width: 1098px) 100vw, 1098px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/19-SAP-HanaLifecycle.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2286\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/19-SAP-HanaLifecycle.jpg\" alt=\"\" width=\"1093\" height=\"614\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/19-SAP-HanaLifecycle.jpg 1093w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/19-SAP-HanaLifecycle-300x169.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/19-SAP-HanaLifecycle-1024x575.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/19-SAP-HanaLifecycle-768x431.jpg 768w\" sizes=\"(max-width: 1093px) 100vw, 1093px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/21-SAP-HanaLifecycle.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2282\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/21-SAP-HanaLifecycle.jpg\" alt=\"\" width=\"1094\" height=\"419\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/21-SAP-HanaLifecycle.jpg 1094w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/21-SAP-HanaLifecycle-300x115.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/21-SAP-HanaLifecycle-1024x392.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/21-SAP-HanaLifecycle-768x294.jpg 768w\" sizes=\"(max-width: 1094px) 100vw, 1094px\" \/><\/a><\/p>\n<h2><\/h2>\n<h2 class=\"p5\"><b><span class=\"s1\">Simplification Item Check<\/span><\/b><\/h2>\n<p class=\"p1\"><span class=\"s1\">To prepare for the release upgrade in SAP S\/4 HANA, you need to perform a &#8220;Simplification Item Check&#8221; on your system. The simplification Item Check determines which Simplification Items are relevant for your specific system. The audit also reveals data inconsistencies or missing mandatory preparation activities that could cause the upgrade to fail.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Make sure you are only running the checks in client 000. This will insure, that data in all clients is checked for inconsistencies. You will find complete instructions for the check in the current version of SAP Note 2502552.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">To start the Simplification Item Check run report:<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">&#8216;\/SDF\/RC_START_CHECK&#8217;<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">in transaction &#8216;sa38&#8217;.<\/span><\/p>\n<h2><\/h2>\n<h2 class=\"p5\"><b><span class=\"s1\">SUM (Software Update Manager)<\/span><\/b><\/h2>\n<p class=\"p1\"><span class=\"s1\">To start with the Software Update Manager (SUM), it must first be downloaded and extracted. It is advisable to update the current version of the SAP Host Agent beforehand.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">We updated the SAP Host Agent manually, for which we downloaded the current version for our operating system from the SAP Launchpad. We carried out the update with the operating system user &lt;SID&gt;adm.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/22-SAP-HostAgentUpgrade.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2280\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/22-SAP-HostAgentUpgrade.jpg\" alt=\"\" width=\"1274\" height=\"652\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/22-SAP-HostAgentUpgrade.jpg 1274w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/22-SAP-HostAgentUpgrade-300x154.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/22-SAP-HostAgentUpgrade-1024x524.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/22-SAP-HostAgentUpgrade-768x393.jpg 768w\" sizes=\"(max-width: 1274px) 100vw, 1274px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Check the version of the SAP Host Agent:<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/23-SAP-HostAgentVersion1.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2278\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/23-SAP-HostAgentVersion1.jpg\" alt=\"\" width=\"1271\" height=\"645\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/23-SAP-HostAgentVersion1.jpg 1271w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/23-SAP-HostAgentVersion1-300x152.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/23-SAP-HostAgentVersion1-1024x520.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/23-SAP-HostAgentVersion1-768x390.jpg 768w\" sizes=\"(max-width: 1271px) 100vw, 1271px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/24-SAP-HostAgentVersion2.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2276\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/24-SAP-HostAgentVersion2.jpg\" alt=\"\" width=\"1273\" height=\"661\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/24-SAP-HostAgentVersion2.jpg 1273w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/24-SAP-HostAgentVersion2-300x156.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/24-SAP-HostAgentVersion2-1024x532.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/24-SAP-HostAgentVersion2-768x399.jpg 768w\" sizes=\"(max-width: 1273px) 100vw, 1273px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Extract the Software Update Manager with SAPCAR into the directory<br \/>\n\/usr\/sap\/&lt;SAPSID&gt;.<\/span><\/p>\n<p class=\"p2\"><span class=\"s1\"><b><br \/>\n<a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/25-SUM-Extract.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2274\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/25-SUM-Extract.jpg\" alt=\"\" width=\"1016\" height=\"117\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/25-SUM-Extract.jpg 1016w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/25-SUM-Extract-300x35.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/25-SUM-Extract-768x88.jpg 768w\" sizes=\"(max-width: 1016px) 100vw, 1016px\" \/><\/a><\/b><\/span><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Change to the directory <i>\/usr\/sap\/&lt;SAPSID&gt;\/SUM\/abap<\/i> <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">To start the upgrade manager execute the command: <i>.\/SUMSTART confighostagent<\/i><\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/26-SUMSTART.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2272\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/26-SUMSTART.jpg\" alt=\"\" width=\"1088\" height=\"596\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/26-SUMSTART.jpg 1088w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/26-SUMSTART-300x164.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/26-SUMSTART-1024x561.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/26-SUMSTART-768x421.jpg 768w\" sizes=\"(max-width: 1088px) 100vw, 1088px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Now copy the URL ( <\/span><span class=\"s2\"><i>https:\/\/&lt;fully qualified hostname&gt;:1129\/lmsl\/sumabap\/&lt;SID&gt;\/slui<\/i><\/span><span class=\"s1\"> )that is displayed under SUM ABAP into a browser. You will be asked for a username and password. The username with which to log in is <i>&lt;sapsid&gt;adm<\/i><\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/27-SUM-Browser-Login.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2270\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/27-SUM-Browser-Login.jpg\" alt=\"\" width=\"787\" height=\"234\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/27-SUM-Browser-Login.jpg 787w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/27-SUM-Browser-Login-300x89.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/27-SUM-Browser-Login-768x228.jpg 768w\" sizes=\"(max-width: 787px) 100vw, 787px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">To start SUM, the stack file that was generated in Maintenance Planer must first be loaded. The red asterisk symbol in front of the field name shows that this is a mandatory input field.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/28-SUM-StackFile.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2262\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/28-SUM-StackFile.jpg\" alt=\"\" width=\"1424\" height=\"546\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/28-SUM-StackFile.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/28-SUM-StackFile-300x115.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/28-SUM-StackFile-1024x393.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/28-SUM-StackFile-768x294.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Next you can specify the scenario strategy. We chose the standard scenario for our upgrade.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/29-SUM-StandardScenario.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2268\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/29-SUM-StandardScenario.jpg\" alt=\"\" width=\"1423\" height=\"405\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/29-SUM-StandardScenario.jpg 1423w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/29-SUM-StandardScenario-300x85.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/29-SUM-StandardScenario-1024x291.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/29-SUM-StandardScenario-768x219.jpg 768w\" sizes=\"(max-width: 1423px) 100vw, 1423px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Next SUM offers to check the authenticity of the downloaded archives.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/30-SUM-AuthenticityCheck.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2266\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/30-SUM-AuthenticityCheck.jpg\" alt=\"\" width=\"1427\" height=\"639\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/30-SUM-AuthenticityCheck.jpg 1427w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/30-SUM-AuthenticityCheck-300x134.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/30-SUM-AuthenticityCheck-1024x459.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/30-SUM-AuthenticityCheck-768x344.jpg 768w\" sizes=\"(max-width: 1427px) 100vw, 1427px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Then the system passwords must be entered.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/31-SUM-SystemPasswords.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2264\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/31-SUM-SystemPasswords.jpg\" alt=\"\" width=\"1428\" height=\"660\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/31-SUM-SystemPasswords.jpg 1428w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/31-SUM-SystemPasswords-300x139.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/31-SUM-SystemPasswords-1024x473.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/31-SUM-SystemPasswords-768x355.jpg 768w\" sizes=\"(max-width: 1428px) 100vw, 1428px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">The screenshot above (31-SUM-SystemPasswords.jpg) shows that the roadmap steps of the upgrade process are now being displayed in SUM for the first time. There are 6 roadmap steps:<\/span><\/p>\n<ul>\n<li class=\"p1\"><span class=\"s2\"><i>Extraction:<\/i><\/span><span class=\"s1\"> The required Software is extracted by SUM.<\/span><\/li>\n<li class=\"p1\"><span class=\"s2\"><i>Configuration:<\/i><\/span><span class=\"s1\"> Software Update Manager requests all the information it needs to run the update. You will also make decisions about the software packages to be included in the process.<\/span><\/li>\n<li class=\"p1\"><span class=\"s2\"><i>Checks:<\/i><\/span><span class=\"s1\"> SUM checks whether the operating system and database version of your source version meet the requirements of the target version. In addition, some application-specific requirements are checked.<\/span><\/li>\n<li class=\"p1\"><span class=\"s2\"><i>Preprocessing:<\/i><\/span><span class=\"s1\"> With this roadmap step, SUM creates the shadow system. The duration of this roadmap step depends on the scenario strategy you have chosen. When preprocessing is complete, the downtime begins.<\/span><\/li>\n<li class=\"p1\"><span class=\"s2\"><i>Execution:<\/i><\/span><span class=\"s1\"> The system is in downtime while SUM is converting application tables and data to match the target release layout.<\/span><\/li>\n<li class=\"p1\"><span class=\"s2\"><i>Postprocessing:<\/i><\/span><span class=\"s1\"> SUM saves the log files and prompts you to begin certain follow-up activities.<\/span><\/li>\n<\/ul>\n<p class=\"p2\"><span class=\"s1\">The process from extraction to start execution can take up to 7 days. If the downtime is to fall on a weekend, for example, then it is advisable to start about 1 week in advance.<\/span><\/p>\n<p class=\"p2\"><span class=\"s1\">Next you will be asked for the path to the download directory.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/32-SUM-ExtractionDownloadDirectory.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2260\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/32-SUM-ExtractionDownloadDirectory.jpg\" alt=\"\" width=\"1423\" height=\"824\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/32-SUM-ExtractionDownloadDirectory.jpg 1423w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/32-SUM-ExtractionDownloadDirectory-300x174.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/32-SUM-ExtractionDownloadDirectory-1024x593.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/32-SUM-ExtractionDownloadDirectory-768x445.jpg 768w\" sizes=\"(max-width: 1423px) 100vw, 1423px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">The task list can be used to view the status of the current, previous, and subsequent steps or phases in the process. You can move the mouse pointer over the symbols of the <i>\u2018Task Type\u2019<\/i> and <i>\u2018Status\u2019<\/i> Columns to open a tooltip with the description.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/33-SUM-Extraction-Logs.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2256\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/33-SUM-Extraction-Logs.jpg\" alt=\"\" width=\"1424\" height=\"467\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/33-SUM-Extraction-Logs.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/33-SUM-Extraction-Logs-300x98.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/33-SUM-Extraction-Logs-1024x336.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/33-SUM-Extraction-Logs-768x252.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">With &#8220;Logs&#8221; you get an overview of the available log files for the current step or the current phase. You can download a log file directly or click a name in the Filename row to open the log file viewer.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/34-SUM-Extraction-TaskList.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2258\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/34-SUM-Extraction-TaskList.jpg\" alt=\"\" width=\"1425\" height=\"433\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/34-SUM-Extraction-TaskList.jpg 1425w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/34-SUM-Extraction-TaskList-300x91.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/34-SUM-Extraction-TaskList-1024x311.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/34-SUM-Extraction-TaskList-768x233.jpg 768w\" sizes=\"(max-width: 1425px) 100vw, 1425px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">SUM has another useful function called &#8216;Breakpoints&#8217;. It allows you to pause the update at a specific point and continue it at a later point in time.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/35-SUM-Breakpoints.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"size-full wp-image-2252 alignleft\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/35-SUM-Breakpoints.jpg\" alt=\"\" width=\"298\" height=\"147\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Roadmap Step \u201aExtraction\u2018 completed successfully.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/36-SUM-Extraction-Completion.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2254\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/36-SUM-Extraction-Completion.jpg\" alt=\"\" width=\"1418\" height=\"424\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/36-SUM-Extraction-Completion.jpg 1418w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/36-SUM-Extraction-Completion-300x90.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/36-SUM-Extraction-Completion-1024x306.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/36-SUM-Extraction-Completion-768x230.jpg 768w\" sizes=\"(max-width: 1418px) 100vw, 1418px\" \/><\/a><\/p>\n<p class=\"p1\"><span class=\"s1\">Start of Roadmap Step \u2018Configuration\u2019<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/37-SUM-Configuration-Start.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2250\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/37-SUM-Configuration-Start.jpg\" alt=\"\" width=\"1423\" height=\"362\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/37-SUM-Configuration-Start.jpg 1423w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/37-SUM-Configuration-Start-300x76.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/37-SUM-Configuration-Start-1024x260.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/37-SUM-Configuration-Start-768x195.jpg 768w\" sizes=\"(max-width: 1423px) 100vw, 1423px\" \/><\/a><\/p>\n<p class=\"p1\"><span class=\"s1\">In the following dialog (INITSUBST) you will be requested to enter further parameters for the configuration of the procedure.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/38-SUM-Configuration-INITSUBST.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2248\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/38-SUM-Configuration-INITSUBST.jpg\" alt=\"\" width=\"1424\" height=\"859\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/38-SUM-Configuration-INITSUBST.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/38-SUM-Configuration-INITSUBST-300x181.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/38-SUM-Configuration-INITSUBST-1024x618.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/38-SUM-Configuration-INITSUBST-768x463.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/39-SUM-Configuration-INITSUBST.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2246\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/39-SUM-Configuration-INITSUBST.jpg\" alt=\"\" width=\"1425\" height=\"844\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/39-SUM-Configuration-INITSUBST.jpg 1425w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/39-SUM-Configuration-INITSUBST-300x178.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/39-SUM-Configuration-INITSUBST-1024x606.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/39-SUM-Configuration-INITSUBST-768x455.jpg 768w\" sizes=\"(max-width: 1425px) 100vw, 1425px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">SUM offers to save your variants. Because the corresponding selection screens have changed after upgrading, many of your variants can no longer be used.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/40-SUM-Configuration-SAVE_VAR_CHK.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2244\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/40-SUM-Configuration-SAVE_VAR_CHK.jpg\" alt=\"\" width=\"1424\" height=\"394\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/40-SUM-Configuration-SAVE_VAR_CHK.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/40-SUM-Configuration-SAVE_VAR_CHK-300x83.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/40-SUM-Configuration-SAVE_VAR_CHK-1024x283.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/40-SUM-Configuration-SAVE_VAR_CHK-768x212.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Summary of Language Updates:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/41-SUM-Configuration-LANG_SELECT.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2242\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/41-SUM-Configuration-LANG_SELECT.jpg\" alt=\"\" width=\"1424\" height=\"527\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/41-SUM-Configuration-LANG_SELECT.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/41-SUM-Configuration-LANG_SELECT-300x111.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/41-SUM-Configuration-LANG_SELECT-1024x379.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/41-SUM-Configuration-LANG_SELECT-768x284.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Check for Technical Users for Silent Data Migration.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/42-SUM-Configuration-SQLSELEXE_CHECK_SDMI_USERS.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2240\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/42-SUM-Configuration-SQLSELEXE_CHECK_SDMI_USERS.jpg\" alt=\"\" width=\"1423\" height=\"431\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/42-SUM-Configuration-SQLSELEXE_CHECK_SDMI_USERS.jpg 1423w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/42-SUM-Configuration-SQLSELEXE_CHECK_SDMI_USERS-300x91.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/42-SUM-Configuration-SQLSELEXE_CHECK_SDMI_USERS-1024x310.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/42-SUM-Configuration-SQLSELEXE_CHECK_SDMI_USERS-768x233.jpg 768w\" sizes=\"(max-width: 1423px) 100vw, 1423px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Add-On Request for SAINT Package that fits to add-on BI_CONT:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/43-SUM-Configuration-EHP_INCLUSION.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2238\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/43-SUM-Configuration-EHP_INCLUSION.jpg\" alt=\"\" width=\"1422\" height=\"467\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/43-SUM-Configuration-EHP_INCLUSION.jpg 1422w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/43-SUM-Configuration-EHP_INCLUSION-300x99.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/43-SUM-Configuration-EHP_INCLUSION-1024x336.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/43-SUM-Configuration-EHP_INCLUSION-768x252.jpg 768w\" sizes=\"(max-width: 1422px) 100vw, 1422px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">The SUM dialog for transport requests.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/44-SUM-Configuration-BIND_PATCH.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2236\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/44-SUM-Configuration-BIND_PATCH.jpg\" alt=\"\" width=\"1423\" height=\"521\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/44-SUM-Configuration-BIND_PATCH.jpg 1423w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/44-SUM-Configuration-BIND_PATCH-300x110.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/44-SUM-Configuration-BIND_PATCH-1024x375.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/44-SUM-Configuration-BIND_PATCH-768x281.jpg 768w\" sizes=\"(max-width: 1423px) 100vw, 1423px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Request for Automatic Modification Adjustment (Phase ADJUSTPRP)<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/45-SUM-Configuration-ADJUSTPRP.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2234\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/45-SUM-Configuration-ADJUSTPRP.jpg\" alt=\"\" width=\"1420\" height=\"686\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/45-SUM-Configuration-ADJUSTPRP.jpg 1420w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/45-SUM-Configuration-ADJUSTPRP-300x145.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/45-SUM-Configuration-ADJUSTPRP-1024x495.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/45-SUM-Configuration-ADJUSTPRP-768x371.jpg 768w\" sizes=\"(max-width: 1420px) 100vw, 1420px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Roadmap Step \u201aConfiguration\u2018 completed successfully.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/46-SUM-Configuration-completed.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2232\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/46-SUM-Configuration-completed.jpg\" alt=\"\" width=\"1424\" height=\"423\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/46-SUM-Configuration-completed.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/46-SUM-Configuration-completed-300x89.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/46-SUM-Configuration-completed-1024x304.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/46-SUM-Configuration-completed-768x228.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Error in the Roadmap Step \u2018Checks\u2019.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/47-SUM-Checks-error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2230\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/47-SUM-Checks-error.jpg\" alt=\"\" width=\"1426\" height=\"477\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/47-SUM-Checks-error.jpg 1426w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/47-SUM-Checks-error-300x100.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/47-SUM-Checks-error-1024x343.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/47-SUM-Checks-error-768x257.jpg 768w\" sizes=\"(max-width: 1426px) 100vw, 1426px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Roadmap Step \u2018Checks\u2019 Error: Background Job RSUPGJOB Failed.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/48-SUM-Checks-RSUPGJOB_Failed.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2228\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/48-SUM-Checks-RSUPGJOB_Failed.jpg\" alt=\"\" width=\"1426\" height=\"468\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/48-SUM-Checks-RSUPGJOB_Failed.jpg 1426w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/48-SUM-Checks-RSUPGJOB_Failed-300x98.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/48-SUM-Checks-RSUPGJOB_Failed-1024x336.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/48-SUM-Checks-RSUPGJOB_Failed-768x252.jpg 768w\" sizes=\"(max-width: 1426px) 100vw, 1426px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Configuration Step Checks: RUN_SDM_CHECK_STARTRELEASE<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/49-SUM-Checks-RUN_SDM_CHECK_STARTRELEASE.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2226\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/49-SUM-Checks-RUN_SDM_CHECK_STARTRELEASE.jpg\" alt=\"\" width=\"1428\" height=\"299\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/49-SUM-Checks-RUN_SDM_CHECK_STARTRELEASE.jpg 1428w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/49-SUM-Checks-RUN_SDM_CHECK_STARTRELEASE-300x63.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/49-SUM-Checks-RUN_SDM_CHECK_STARTRELEASE-1024x214.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/49-SUM-Checks-RUN_SDM_CHECK_STARTRELEASE-768x161.jpg 768w\" sizes=\"(max-width: 1428px) 100vw, 1428px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Roadmap Step \u2018Checks\u2019 Error: \u2018Old Persistance Format\u2019 PREP_GENCHECKS\/HDB_CHK_NSE_OLDPERSISTENCE<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/50-SUM-Checks-HDB_CHK_NSE_OLDPERSISTENCE.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2224\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/50-SUM-Checks-HDB_CHK_NSE_OLDPERSISTENCE.jpg\" alt=\"\" width=\"1430\" height=\"764\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/50-SUM-Checks-HDB_CHK_NSE_OLDPERSISTENCE.jpg 1430w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/50-SUM-Checks-HDB_CHK_NSE_OLDPERSISTENCE-300x160.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/50-SUM-Checks-HDB_CHK_NSE_OLDPERSISTENCE-1024x547.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/50-SUM-Checks-HDB_CHK_NSE_OLDPERSISTENCE-768x410.jpg 768w\" sizes=\"(max-width: 1430px) 100vw, 1430px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Solving Error Oldpersistence Format Step 1<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/51-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2222\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/51-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\" alt=\"\" width=\"1404\" height=\"823\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/51-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg 1404w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/51-SUM-Checks-Solving_OLDPERSISTENCE_Error-300x176.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/51-SUM-Checks-Solving_OLDPERSISTENCE_Error-1024x600.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/51-SUM-Checks-Solving_OLDPERSISTENCE_Error-768x450.jpg 768w\" sizes=\"(max-width: 1404px) 100vw, 1404px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Solving Error Oldpersistence Format Step 2<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/52-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2220\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/52-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\" alt=\"\" width=\"1429\" height=\"182\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/52-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg 1429w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/52-SUM-Checks-Solving_OLDPERSISTENCE_Error-300x38.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/52-SUM-Checks-Solving_OLDPERSISTENCE_Error-1024x130.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/52-SUM-Checks-Solving_OLDPERSISTENCE_Error-768x98.jpg 768w\" sizes=\"(max-width: 1429px) 100vw, 1429px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Solving Error Oldpersistence Format Step 3, Executing SQL Command in HANA DB Studio.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/53-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2218\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/53-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\" alt=\"\" width=\"1913\" height=\"790\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/53-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg 1913w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/53-SUM-Checks-Solving_OLDPERSISTENCE_Error-300x124.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/53-SUM-Checks-Solving_OLDPERSISTENCE_Error-1024x423.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/53-SUM-Checks-Solving_OLDPERSISTENCE_Error-768x317.jpg 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/53-SUM-Checks-Solving_OLDPERSISTENCE_Error-1536x634.jpg 1536w\" sizes=\"(max-width: 1913px) 100vw, 1913px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Solving Error Oldpersistence Format Step 4, Executing SQL Command in HANA DB Studio.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/54-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2216\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/54-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg\" alt=\"\" width=\"1911\" height=\"910\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/54-SUM-Checks-Solving_OLDPERSISTENCE_Error.jpg 1911w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/54-SUM-Checks-Solving_OLDPERSISTENCE_Error-300x143.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/54-SUM-Checks-Solving_OLDPERSISTENCE_Error-1024x488.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/54-SUM-Checks-Solving_OLDPERSISTENCE_Error-768x366.jpg 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/54-SUM-Checks-Solving_OLDPERSISTENCE_Error-1536x731.jpg 1536w\" sizes=\"(max-width: 1911px) 100vw, 1911px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">In the Roadmap Step \u2018Preprocessing\u2019 SUM creates the shadow system. The next Figure shows repairs and requests containing objects locked by SAP.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/55-SUM-Preprocessing_REPACHK1.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2214\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/55-SUM-Preprocessing_REPACHK1.jpg\" alt=\"\" width=\"1422\" height=\"752\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/55-SUM-Preprocessing_REPACHK1.jpg 1422w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/55-SUM-Preprocessing_REPACHK1-300x159.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/55-SUM-Preprocessing_REPACHK1-1024x542.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/55-SUM-Preprocessing_REPACHK1-768x406.jpg 768w\" sizes=\"(max-width: 1422px) 100vw, 1422px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">The &#8220;Allocation failed&#8221; error occurred in several times during our upgrade. This is most probably since we are equipped with a main memory at the lower limit of 64 GB. We have increased the &#8216;Global Allocation Limit&#8217; variable at 58 GB. After the error continued to occur, we canceled the installation at this point with &#8216;Breakingpoints&#8217; and restarted the server. After that, this problem no longer occurred.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/56-SUM-Preprocessing_Allocation_Error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2212\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/56-SUM-Preprocessing_Allocation_Error.jpg\" alt=\"\" width=\"1425\" height=\"828\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/56-SUM-Preprocessing_Allocation_Error.jpg 1425w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/56-SUM-Preprocessing_Allocation_Error-300x174.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/56-SUM-Preprocessing_Allocation_Error-1024x595.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/56-SUM-Preprocessing_Allocation_Error-768x446.jpg 768w\" sizes=\"(max-width: 1425px) 100vw, 1425px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Roadmap Step \u2018Preprocessing\u2019 EU_IMPORT_ALL<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/57-SUM-Preprocessing_EU_IMPORT_ALL.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2210\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/57-SUM-Preprocessing_EU_IMPORT_ALL.jpg\" alt=\"\" width=\"1425\" height=\"506\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/57-SUM-Preprocessing_EU_IMPORT_ALL.jpg 1425w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/57-SUM-Preprocessing_EU_IMPORT_ALL-300x107.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/57-SUM-Preprocessing_EU_IMPORT_ALL-1024x364.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/57-SUM-Preprocessing_EU_IMPORT_ALL-768x273.jpg 768w\" sizes=\"(max-width: 1425px) 100vw, 1425px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Phase REPACHK2, Lock Development Environment.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/58-SUM-Preprocessing_REPACHK2.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2208\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/58-SUM-Preprocessing_REPACHK2.jpg\" alt=\"\" width=\"1429\" height=\"365\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/58-SUM-Preprocessing_REPACHK2.jpg 1429w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/58-SUM-Preprocessing_REPACHK2-300x77.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/58-SUM-Preprocessing_REPACHK2-1024x262.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/58-SUM-Preprocessing_REPACHK2-768x196.jpg 768w\" sizes=\"(max-width: 1429px) 100vw, 1429px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Error in Phase Preprocessing START_SHDI_FIRST<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/59-SUM-Preprocessing_START_SHDI_FIRST_Error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2206\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/59-SUM-Preprocessing_START_SHDI_FIRST_Error.jpg\" alt=\"\" width=\"1422\" height=\"725\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/59-SUM-Preprocessing_START_SHDI_FIRST_Error.jpg 1422w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/59-SUM-Preprocessing_START_SHDI_FIRST_Error-300x153.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/59-SUM-Preprocessing_START_SHDI_FIRST_Error-1024x522.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/59-SUM-Preprocessing_START_SHDI_FIRST_Error-768x392.jpg 768w\" sizes=\"(max-width: 1422px) 100vw, 1422px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">This action fixed the problem.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/60-SUM-Preprocessing_START_SHDI_FIRST_Error.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2204\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/60-SUM-Preprocessing_START_SHDI_FIRST_Error.jpg\" alt=\"\" width=\"1226\" height=\"1046\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/60-SUM-Preprocessing_START_SHDI_FIRST_Error.jpg 1226w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/60-SUM-Preprocessing_START_SHDI_FIRST_Error-300x256.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/60-SUM-Preprocessing_START_SHDI_FIRST_Error-1024x874.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/60-SUM-Preprocessing_START_SHDI_FIRST_Error-768x655.jpg 768w\" sizes=\"(max-width: 1226px) 100vw, 1226px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Here SUM asks you to adapt your changes to ABAP Dictionary objects. In this way, they correspond to the new SAP standard version of the objects.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/61-SUM-Preprocessing_ACT_UPG.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2202\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/61-SUM-Preprocessing_ACT_UPG.jpg\" alt=\"\" width=\"1428\" height=\"678\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/61-SUM-Preprocessing_ACT_UPG.jpg 1428w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/61-SUM-Preprocessing_ACT_UPG-300x142.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/61-SUM-Preprocessing_ACT_UPG-1024x486.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/61-SUM-Preprocessing_ACT_UPG-768x365.jpg 768w\" sizes=\"(max-width: 1428px) 100vw, 1428px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">At the end of the Preprocessing Roadmap Step you enter the preparations for Downtime.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/62-SUM-Preprocessing_Preparation_Downtime.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2200\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/62-SUM-Preprocessing_Preparation_Downtime.jpg\" alt=\"\" width=\"1427\" height=\"522\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/62-SUM-Preprocessing_Preparation_Downtime.jpg 1427w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/62-SUM-Preprocessing_Preparation_Downtime-300x110.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/62-SUM-Preprocessing_Preparation_Downtime-1024x375.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/62-SUM-Preprocessing_Preparation_Downtime-768x281.jpg 768w\" sizes=\"(max-width: 1427px) 100vw, 1427px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Backup Request before Downtime:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/63-SUM-Preprocessing_Backup_Request.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2198\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/63-SUM-Preprocessing_Backup_Request.jpg\" alt=\"\" width=\"1427\" height=\"599\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/63-SUM-Preprocessing_Backup_Request.jpg 1427w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/63-SUM-Preprocessing_Backup_Request-300x126.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/63-SUM-Preprocessing_Backup_Request-1024x430.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/63-SUM-Preprocessing_Backup_Request-768x322.jpg 768w\" sizes=\"(max-width: 1427px) 100vw, 1427px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Completion of the Roadmap Step \u2018Preprocessing\u2019<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/64-SUM-Preprocessing_Completion.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2196\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/64-SUM-Preprocessing_Completion.jpg\" alt=\"\" width=\"1424\" height=\"398\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/64-SUM-Preprocessing_Completion.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/64-SUM-Preprocessing_Completion-300x84.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/64-SUM-Preprocessing_Completion-1024x286.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/64-SUM-Preprocessing_Completion-768x215.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">In the STARTSAP_PUPG phase you will be asked to make a full backup of your database.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/65-SUM-Execution_STARTSAP_PUG.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2194\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/65-SUM-Execution_STARTSAP_PUG.jpg\" alt=\"\" width=\"1424\" height=\"365\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/65-SUM-Execution_STARTSAP_PUG.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/65-SUM-Execution_STARTSAP_PUG-300x77.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/65-SUM-Execution_STARTSAP_PUG-1024x262.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/65-SUM-Execution_STARTSAP_PUG-768x197.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">End of SUM technical Downtime<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/66-SUM-Execution_End_technical_Downtime.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2192\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/66-SUM-Execution_End_technical_Downtime.jpg\" alt=\"\" width=\"1424\" height=\"363\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/66-SUM-Execution_End_technical_Downtime.jpg 1424w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/66-SUM-Execution_End_technical_Downtime-300x76.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/66-SUM-Execution_End_technical_Downtime-1024x261.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/66-SUM-Execution_End_technical_Downtime-768x196.jpg 768w\" sizes=\"(max-width: 1424px) 100vw, 1424px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">We have now entered the Postprocessing Phase. If you have changed programs, screens, or user interfaces, you must adapt them using transaction SPAU and, if necessary, transaction SPAU_ENH.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/67-SUM-Postprocessing_SPAUINFO.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2190\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/67-SUM-Postprocessing_SPAUINFO.jpg\" alt=\"\" width=\"1427\" height=\"491\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/67-SUM-Postprocessing_SPAUINFO.jpg 1427w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/67-SUM-Postprocessing_SPAUINFO-300x103.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/67-SUM-Postprocessing_SPAUINFO-1024x352.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/67-SUM-Postprocessing_SPAUINFO-768x264.jpg 768w\" sizes=\"(max-width: 1427px) 100vw, 1427px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">SUM Postprocessing Start of Cleanup Processing<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/68-SUM-Postprocessing_REQ_UP_FINAL.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2188\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/68-SUM-Postprocessing_REQ_UP_FINAL.jpg\" alt=\"\" width=\"1429\" height=\"403\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/68-SUM-Postprocessing_REQ_UP_FINAL.jpg 1429w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/68-SUM-Postprocessing_REQ_UP_FINAL-300x85.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/68-SUM-Postprocessing_REQ_UP_FINAL-1024x289.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/68-SUM-Postprocessing_REQ_UP_FINAL-768x217.jpg 768w\" sizes=\"(max-width: 1429px) 100vw, 1429px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">SUM asks you to confirm that all imports of customer transports and additional software installations have been completed and that further imports will not be started until the end of the process.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/69-SUM-Postprocessing_REQ_FINISH_IMPORT.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2186\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/69-SUM-Postprocessing_REQ_FINISH_IMPORT.jpg\" alt=\"\" width=\"1434\" height=\"463\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/69-SUM-Postprocessing_REQ_FINISH_IMPORT.jpg 1434w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/69-SUM-Postprocessing_REQ_FINISH_IMPORT-300x97.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/69-SUM-Postprocessing_REQ_FINISH_IMPORT-1024x331.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/69-SUM-Postprocessing_REQ_FINISH_IMPORT-768x248.jpg 768w\" sizes=\"(max-width: 1434px) 100vw, 1434px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">The Upgrade Procedure is finished. The Installation is complete, and you can now perform follow-up activities.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/70-SUM-Postprocessing_Follow_Up_Activities.jpg\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2184\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/70-SUM-Postprocessing_Follow_Up_Activities.jpg\" alt=\"\" width=\"1425\" height=\"594\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/70-SUM-Postprocessing_Follow_Up_Activities.jpg 1425w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/70-SUM-Postprocessing_Follow_Up_Activities-300x125.jpg 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/70-SUM-Postprocessing_Follow_Up_Activities-1024x427.jpg 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/70-SUM-Postprocessing_Follow_Up_Activities-768x320.jpg 768w\" sizes=\"(max-width: 1425px) 100vw, 1425px\" \/><\/a><\/p>\n<h2 class=\"p1\"><b><span class=\"s1\">Postupgrade issues<\/span><\/b><\/h2>\n<p class=\"p1\"><span class=\"s1\">Firs regenerate relevant objects in Transaction SGEN.<\/span><\/p>\n<h3 class=\"p3\"><b><span class=\"s1\">Postupgrade issue nr. 1: n<\/span><\/b><span class=\"s1\">ot able to access SAP Fiori Launchpad<\/span><\/h3>\n<p class=\"p1\"><span class=\"s1\">When trying to access SAP Fiori Launchpad for the first time after the upgrade we got an error \u201cFailed to load resource. Server responded with a status of 403 <\/span><span class=\"s2\">()\u201d in the Source code inspector of the web browser.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">As we found<\/span><span class=\"s3\">ed<\/span><span class=\"s1\"> out the reason for this issue was <\/span><span class=\"s2\"><b>an<\/b><\/span><span class=\"s1\"> incomplete \u201cClickjacking protection\u201d configuration. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">We followed this SAP note 2973874 and SAP help to implement a \u201cwhite list\u201d as follows:<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\"><a href=\"https:\/\/launchpad.support.sap.com\/%252523\/notes\/2973874\"><span class=\"s4\">https:\/\/launchpad.support.sap.com\/#\/notes\/2973874<\/span><\/a>\u00a0<\/span><\/p>\n<p class=\"p2\"><span class=\"s4\"><a href=\"https:\/\/help.sap.com\/viewer\/864321b9b3dd487d94c70f6a007b0397\/7.31.21\/en-US\/966b6233e5404ebe80513ae082131132.html#:~:text=You%2520need%2520to%2520protect%2520your,application%2520by%2520hijacking%2520mouse%2520clicks\">https:\/\/help.sap.com\/viewer\/864321b9b3dd487d94c70f6a007b0397\/7.31.21\/en-US\/966b6233e5404ebe80513ae082131132.html#:~:text=You%20need%20to%20protect%20your,application%20by%20hijacking%20mouse%20clicks<\/a><\/span><span class=\"s5\">. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Enable \u201cClickjacking protection\u201d<span class=\"Apple-converted-space\">\u00a0 <\/span>in transaction SICF_INST<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2168\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues.png\" alt=\"\" width=\"2162\" height=\"356\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues.png 2162w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues-300x49.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues-1024x169.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues-768x126.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues-1536x253.png 1536w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/1-postupgrade_issues-2048x337.png 2048w\" sizes=\"(max-width: 2162px) 100vw, 2162px\" \/><\/a><\/p>\n<p class=\"p1\"><span class=\"s1\">Activate \u201cwhitelist service\u201d in transaction SICF:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/2-postupgrade_issues.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2170\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/2-postupgrade_issues.png\" alt=\"\" width=\"1636\" height=\"1158\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/2-postupgrade_issues.png 1636w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/2-postupgrade_issues-300x212.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/2-postupgrade_issues-1024x725.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/2-postupgrade_issues-768x544.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/2-postupgrade_issues-1536x1087.png 1536w\" sizes=\"(max-width: 1636px) 100vw, 1636px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Set parameters for the \u201cwhite list\u201d in transaction UCON_CHW:<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2325\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1.png\" alt=\"\" width=\"2058\" height=\"1012\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1.png 2058w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1-300x148.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1-1024x504.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1-768x378.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1-1536x755.png 1536w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/3-postupgrade_issues-1-2048x1007.png 2048w\" sizes=\"(max-width: 2058px) 100vw, 2058px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<h3 class=\"p1\"><b><span class=\"s1\">Postupgrade issue nr. 2: <\/span><\/b><span class=\"s1\">Some Fiori apps could not be loaded on the SAP Fiori Launchpad<\/span><\/h3>\n<p class=\"p1\"><span class=\"s2\">Once we were able to access SAP Fiori Launchpad we <\/span><span class=\"s1\">noticed<\/span><span class=\"s2\"> that some Fiori apps do not load anymore.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2174\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues.png\" alt=\"\" width=\"2182\" height=\"276\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues.png 2182w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues-300x38.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues-1024x130.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues-768x97.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues-1536x194.png 1536w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/4-postupgrade_issues-2048x259.png 2048w\" sizes=\"(max-width: 2182px) 100vw, 2182px\" \/><\/a><\/p>\n<p class=\"p1\"><span class=\"s1\">We found out there might be two reasons causing this issue:<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Reason #1: The apps are from a catalogue which is outdated in the current <\/span><span class=\"s2\">version.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">We followed this SAP note 2594655 to update the outdated catalogue in SAP Fiori Launchpad Designer:<\/span><\/p>\n<p class=\"p1\"><span class=\"s3\"><a href=\"https:\/\/launchpad.support.sap.com\/#\/notes\/2594655\">https:\/\/launchpad.support.sap.com\/#\/notes\/2594655<\/a><\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">The side effect of this update was a deletion of all customer-defined tiles created in this catalogue before the upgrade \ud83d\ude41 So that those tiles had to be re-created again).<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2176\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues.png\" alt=\"\" width=\"2224\" height=\"1028\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues.png 2224w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues-300x139.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues-1024x473.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues-768x355.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues-1536x710.png 1536w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/5-postupgrade_issues-2048x947.png 2048w\" sizes=\"(max-width: 2224px) 100vw, 2224px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Reason #2: Services for \u201cSmart Business\u201d Apps (aka KPI tiles) are not activated.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">While analyzing errors in the source code inspector of the browser we noticed the message \u201cICF node for Service \u2018SMART-BUSINESS-RUNTIME_SRV\u2019, Namespace \u2018\/SBB\/\u2018 not available under node\u201d.<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2178\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues.png\" alt=\"\" width=\"2388\" height=\"194\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues.png 2388w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues-300x24.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues-1024x83.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues-768x62.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues-1536x125.png 1536w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/6-postupgrade_issues-2048x166.png 2048w\" sizes=\"(max-width: 2388px) 100vw, 2388px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">We followed the SAP not 2648505 to add Smart Business services:<\/span><\/p>\n<p class=\"p1\"><span class=\"s2\"><a href=\"https:\/\/launchpad.support.sap.com\/#\/notes\/2648505\">https:\/\/launchpad.support.sap.com\/#\/notes\/2648505<\/a><\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Open transaction SICF on the front-end system and make sure that the following nodes are there and active.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">default_host\/sap\/opu\/odata\/ssb\/smart_business_runtime_srv<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">default_host\/sap\/opu\/odata\/ssb\/smart_business_designtime_srv<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Open transaction IWFND\/MAINT_SERVICES and add services <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">SMART_BUSINESS_RUNTIME_SRV<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">SMART_BUSINESS_DESIGNTIME_SRV<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/7-postupgrade_issues.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2180\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/7-postupgrade_issues.png\" alt=\"\" width=\"1810\" height=\"990\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/7-postupgrade_issues.png 1810w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/7-postupgrade_issues-300x164.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/7-postupgrade_issues-1024x560.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/7-postupgrade_issues-768x420.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/7-postupgrade_issues-1536x840.png 1536w\" sizes=\"(max-width: 1810px) 100vw, 1810px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">Reason #3: Apps are obsolete in the current Release.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">Some apps are being replaced with new versions. To use the new versions, the old version of the apps have to be deleted from SAP Fiori Launchpad and the new versions of the apps have to be added.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">We followed this blog to find the successor-apps for our obsolete apps:<\/span><\/p>\n<p class=\"p2\"><span class=\"s2\"><a href=\"https:\/\/blogs.sap.com\/2019\/01\/08\/fiori-for-s4hana-finding-the-delta-of-new-apps-between-sap-s4hana-versions\/\">https:\/\/blogs.sap.com\/2019\/01\/08\/fiori-for-s4hana-finding-the-delta-of-new-apps-between-sap-s4hana-versions\/<\/a><\/span><\/p>\n<h3 class=\"p1\"><b><span class=\"s1\">Postupgrade Issue nr. 3: The operating concern was deactivated during the upgrade and cannot be activated due to table inconsistencies<\/span><\/b><\/h3>\n<p class=\"p1\"><span class=\"s1\">While trying to active the operating concern in transaction KEA0 we got the error<span class=\"Apple-converted-space\">\u00a0 <\/span>DD_DBAL001 \u201cSQL Exception: SQL code: 308; SQL message: column name already exists: SOLUTION_ORDER_ID: lin&#8221;<\/span><\/p>\n<p><a href=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues.png\"><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter size-full wp-image-2182\" src=\"http:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues.png\" alt=\"\" width=\"2346\" height=\"984\" srcset=\"https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues.png 2346w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues-300x126.png 300w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues-1024x430.png 1024w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues-768x322.png 768w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues-1536x644.png 1536w, https:\/\/agil-on.com\/wp-content\/uploads\/2021\/06\/8-postupgrade_issues-2048x859.png 2048w\" sizes=\"(max-width: 2346px) 100vw, 2346px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p class=\"p1\"><span class=\"s1\">The reason for this issue were differences in the COPA table CE1AGXX in SAP application vs. in HANA DB: in HANA DB the table had two more columns with field IDs SOLUTION_ORDER_ID and SOLUTION_ORDER_ITEM_ID. <\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">These columns have been created automatically during S\/4 HANA upgrade.<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">To solve this issue, we deleted these columns in HANA DB by executing the SQL commandos:<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">ALTER TABLE CE1AGXX<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">DROP COLUMN SOLUTION_ORDER_ID;<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">and<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">ALTER TABLE CE1AGXX<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">DROP COLUMN SOLUTION_ORDER_ITEM_ID;<\/span><\/p>\n<p class=\"p1\"><span class=\"s1\">After that we were able to activate the operating concern in transaction KEA0 and the table consistency issue was solved &#8211; the table CE1AGXX had now columns SOLUTION_ORDER_ID and SOLUTION_ORDER_ITEM_ID on the application servers as well as in HANA DB.<\/span><\/p>\n<p class=\"p1\">\n","protected":false},"excerpt":{"rendered":"<p>Follow @AgilonGmbh We upgraded our On-Premise demo system from S\/4 HANA 1909 to 2020 and would like to share our experiences with you in this blog post. SUSE Linux Enterprise Server 15 SP2 is the operating system. Before starting an update, make sure to study the instructions provided by SAP, e.g. The Upgrade Guide to [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[16],"tags":[55,66],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/posts\/2164"}],"collection":[{"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/comments?post=2164"}],"version-history":[{"count":3,"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/posts\/2164\/revisions"}],"predecessor-version":[{"id":2350,"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/posts\/2164\/revisions\/2350"}],"wp:attachment":[{"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/media?parent=2164"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/categories?post=2164"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/agil-on.com\/en\/wp-json\/wp\/v2\/tags?post=2164"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}